Skip to content

Offshore Case Studies

FTI GRP Fibaroll and FibaClad insulation cladding offshore
corrosion under insulation CUI FTI Offshore
FPSO Refurbishment Dalia Africa FTI

Case Study – K2JV Johan Sverdrup

On Statoil / Equinor’s giant Johan Sverdrup project off the Norwegian continental shelf, K2JV – a joint venture between Kvaerner & KBR – built the utility platform and subcontracted work to build the living quarters. FTI FibaClad was selected as the preferred system in the ‘GRP’ specification because of FTI’s twenty-year history of producing consistent, high-quality cladding.

READ MORE

Case Study – BP Quad 204 & Clair Ridge

Quad 204 FPSO, also called Glen Lyon, and the Clair Ridge Platform were built by BP to service fields in the North Sea, west of Shetland, Scotland. BP specified FibaClad as a result of poor experience with another non-metallic cladding system.

READ MORE

Case Study – Total Dalia FPSO Refurbishment, West Africa

Total specified FibaClad & Foamglas as a result of experiencing severe corrosion under insulation (CUI) just six years after installing another non-metallic cladding system.

READ MORE

Back To Top