Offshore Case Studies
Case Study – K2JV Johan Sverdrup
On Statoil / Equinor’s giant Johan Sverdrup project off the Norwegian continental shelf, K2JV – a joint venture between Kvaerner & KBR – built the utility platform and subcontracted work to build the living quarters. FTI FibaClad was selected as the preferred system in the ‘GRP’ specification because of FTI’s twenty-year history of producing consistent, high-quality cladding.
Case Study – BP Quad 204 & Clair Ridge
Quad 204 FPSO, also called Glen Lyon, and the Clair Ridge Platform were built by BP to service fields in the North Sea, west of Shetland, Scotland. BP specified FibaClad as a result of poor experience with another non-metallic cladding system.
Case Study – Total Dalia FPSO Refurbishment, West Africa
Total specified FibaClad & Foamglas as a result of experiencing severe corrosion under insulation (CUI) just six years after installing another non-metallic cladding system.