Case Study – Pre-insulated pipes for Petronas, Malaysia
The RAPID project in Malaysia has a jetty which is 2.5km long, with expansion loops which carry three LNG and several petrochemical product lines. The LNG lines were to be 42”, 30” and 8” in diameter.