Skip to content

Onshore Case Studies

Pre Insulation Pengarang Malaysia

Case Study – Pre-insulated pipes for Petronas, Malaysia

The RAPID project in Malaysia has a jetty which is 2.5km long, with expansion loops which carry three LNG and several petrochemical product lines. The LNG lines were to be 42”, 30” and 8” in diameter.

READ MORE

Back To Top

This website stores cookies on your computer. These cookies are used to provide a more personalized experience and to track your whereabouts around our website in compliance with the European General Data Protection Regulation. If you decide to to opt-out of any future tracking, a cookie will be setup in your browser to remember this choice for one year.

Accept or Deny